This project was a phase two expansion of Mt. Prevost’s existing climbing facility. Working with School District 79 guidelines and gym operational constraints, the project was completed on time and on budget.
Higginson Consulting worked closely with Geoff Creighton of High Performance Climbing Walls to provide detailed design drawings and 3D renderings for the client.
This wall features a smooth textured surface suitable for both competition climbing and school groups.
The main structure for this wall is wood framing, with steel brackets attached for the top rope belay points.